These pictures are of a two story extension that we finished in November 2010 in Crumlin that took twelve weeks to build.

The extension consists of:

  • Downstairs toilet
  • Utility cupboard
  • Kitchen
  • Bedrooms

Renovation work also took place to the main house while the extension was being built.

This renovation consists of:

  • Rewiring the house
  • Replumbing the house
  • Installing a new gas heating system
  • Insulating and plastering
  • Fitting new A rated PVC windows and doors
  • New solid oak floor and skirting through out the down stairs
  • Laminate flooring throughout the up stairs
  • Fitting new oak doors and frames
  • Building and fitting a custom made curved bar
  • Building and fitting a custom made TV panel
  • Fitting new oak staircase
  • Building and fitting new built in wardrobes into all the bedrooms
  • Painting and decorating

These renovations made the house look very modern and some of this renovation was necessary to give the house a BER A rating.